D425 road (Croatia)
D425 state road | |
---|---|
Lua error in Module:Infobox_road/map at line 16: attempt to index field 'wikibase' (a nil value). | |
Route information | |
Length: | 17.6 km (10.9 mi) |
Major junctions | |
From: | ![]() |
To: | ![]() |
Location | |
Counties: | Dubrovnik-Neretva |
Highway system | |
State roads in Croatia |
D425 is a state road in Croatia, connecting the outskirts of Ploče with the D62 state road, and is a part of a system of roads that connect the A1 motorway Ploče interchange to the Port of Ploče.[1][2] The road is 17.6 km (10.9 mi) long.[3]
The road, as well as all other state roads in Croatia, is managed and maintained by Hrvatske ceste, state owned company.[4] The dual carriageway part of the route was built in two phases, the first between finished in December 2008,[2] and the second in December 2013.[1]
Traffic volume
Traffic is regularly counted and reported by Hrvatske ceste, the operator of the road.[5] Substantial variations between annual (AADT) and summer (ASDT) traffic volumes are attributed to the fact that the road serves as a connection to the A1 motorway and the D8 state road carrying substantial tourist traffic.
D425 traffic volume | ||||
Road | Counting site | AADT | ASDT | Notes |
![]() |
6019 Borovci | 1,516 | 2,301 | As of 2011[update]. Between the (former) D513 junction and the D8 junction. |
Road junctions and populated areas
D425 junctions/populated areas | |
Type | Slip roads/Notes |
![]() |
![]() The northern terminus of the road. |
![]() |
Ploče interchange.[1]![]() |
|
|
![]() |
Karamatići toll plaza[1] |
![]() |
Zmijarevići Tunnel Two tube, four-lane tunnel. The tunnel tubes are 200 m (660 ft) and 400 m (1,300 ft) long respectively. |
21px | Ploče rest area |
![]() |
Radonjić Viaduct Four lane viaduct, executed as two parallel structures. The structures are 288 m (945 ft) and 310 m (1,020 ft) long respectively. |
![]() |
The southern terminus of the dual carriageway expressway to the Port of Ploče.[citation needed] |
![]() |
Petrovac Tunnel The tunnel is 497 m (1,631 ft) long. |
![]() |
Međak Tunnel The tunnel is 341 m (1,119 ft) long. |
![]() |
![]() The southern terminus of the road. |
Sources
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
![]() |
Wikimedia Commons has media related to Državna cesta 425. |
- ↑ 1.0 1.1 1.2 1.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- Pages with reference errors
- Pages with broken file links
- Articles containing potentially dated statements from 2011
- Incomplete lists from July 2014
- Articles with unsourced statements from July 2014
- Commons category link is locally defined
- Expressways in Croatia
- State roads in Croatia
- Dubrovnik-Neretva County