Chiba Urban Monorail
Lua error in package.lua at line 80: module 'strict' not found.
File:Chiba monorail train.jpg | |
Overview | |
---|---|
Locale | Chiba, Chiba Prefecture |
Transit type | Monorail (suspended) |
Number of lines | 2 |
Number of stations | 18 |
Daily ridership | 45,430 daily boardings (2008) |
Chief executive | Kazuaki Okada |
Headquarters | 199-1 Hagidai-chō, Inage-ku, Chiba, Chiba Prefecture |
Operation | |
Began operation | 1988 |
Operator(s) | Chiba Urban Monorail Co., Ltd. |
Number of vehicles | 1000 series |
Technical | |
System length | 15.2 km (9.44 mi) |
Electrification | 1500V DC |
Chiba Monorail Map | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Chiba Urban Monorail (千葉都市モノレール Chiba Toshi Monorēru?) is a two-line suspended monorail system located in Chiba, Chiba Prefecture, Japan. It is owned and operated by Chiba Urban Monorail Co., Ltd (千葉都市モノレール株式会社 Chiba toshi monorēru kabushikigaisha?), a so-called "third-sector" company established on March 20, 1979. Investors include Chiba Prefecture and the city of Chiba.
The first segment (Line 2 from Sports Center Station to Chishirodai Station) opened on March 28, 1988, the remainder 11 years later on March 24, 1999. The PASMO contactless smart card can be used to purchase fares.
It is the longest suspended monorail system at 15.2 km in track length. The Chongqing Monorail is the longest monorail system.
Contents
Routes
Line 1
Line 1 connects Chiba Minato Station and Kencho-mae Station by a 3.2 km multiple-track route. Operating at 1500 VDC, trains make four intermediate stops.
Station list
Station | Japanese | Distance (km) |
Transfers |
---|---|---|---|
Chiba-Minato | 千葉みなと | 0.0 | JR East: Keiyo Line |
Shiyakusho-Mae | 市役所前 | 0.7 | |
Chiba | 千葉 | 1.5 | JR East: Sōbu Line, Sotobō Line, Uchibō Line, Narita Line Chiba Urban Monorail Line 2 |
Sakaechō | 栄町 | 2.0 | |
Yoshikawa-Kōen | 葭川公園 | 2.5 | |
Kenchō-Mae | 県庁前駅 | 3.2 |
Line 2
Line 2 connects Chiba Station and Chishiro-dai Station. Operating at 1500 VDC, trains make 11 intermediate stops on the 12.0 km multiple-track route. Nearly all trains continue on Line 1 to Chiba-Minato Station.
Station list
Station | Japanese | Distance (km) |
Transfers |
---|---|---|---|
Chiba | 千葉 | 0.0 | JR East: Sōbu Line, Sotobō Line, Uchibō Line, Narita Line Chiba Urban Monorail Line 1 |
Chiba-Kōen | 千葉公園 | 1.1 | |
Sakusabe | 作草部 | 1.8 | |
Tendai | 天台 | 2.5 | |
Anagawa | 穴川 | 3.4 | |
Sports Center | スポーツセンター | 4.0 | |
Dōbutsu-Kōen | 動物公園 | 5.2 | |
Mitsuwadai | みつわ台 | 6.2 | |
Tsuga | 都賀 | 7.7 | JR East: Sōbu Line |
Sakuragi | 桜木 | 9.0 | |
Oguradai | 小倉台 | 10.2 | |
Chishirodai-Kita | 千城台北 | 11.2 | |
Chishirodai | 千城台 | 12.0 |
Extension Plans
Extensions of Line 1 have been proposed, notably a five-station, 3.4-km extension from Kenchō-mae Station to Chiba Municipal Aoba Hospital. However, in 2004 an evaluation committee found that there was no need for the extension, and proposed closing the underused segment from Chiba Station to Kencho-mae Station. An alternative 2 km extension to Chiba University is[when?] under consideration.
History
Lua error in package.lua at line 80: module 'strict' not found.
Special Tickets
Holiday Free Pass (ホリデーフリーきっぷ)
- Available: Saturdays, Sundays, and holidays.
- Cost: Adults 600 yen, children 300 yen
- Valid: All day on the day of purchase.
2-Day Free Pass (2-DAYフリーきっぷ)
- Available: Two consecutive days. Saturdays, Sundays and holidays.
- Cost: Adults 1000 yen, children 300 yen
- Valid: All day on the day of purchase.
Lunchtime Free Pass (お昼のお出かけフリーきっぷ)
- Available: From 10AM on weekdays.
- Cost: Adults 600 yen, children 300 yen
- Valid: From 10AM to 6PM on day purchased.
- Note: can be used at 120 locations for special discounts and services on the day of purchase.
See also
External links
![]() |
Wikimedia Commons has media related to [[commons:Lua error in Module:WikidataIB at line 506: attempt to index field 'wikibase' (a nil value).|Lua error in Module:WikidataIB at line 506: attempt to index field 'wikibase' (a nil value).]]. |
- Company website in English
- Company website in Japanese
- Pages with broken file links
- Articles containing Japanese-language text
- Vague or ambiguous time from May 2011
- Articles using small message boxes
- Commons category link from Wikidata
- Chiba Urban Monorail
- Monorails in Japan
- Suspended monorails
- SAFEGE people movers
- Railway lines opened in 1988
- Transport in Chiba, Chiba