Status Operational
Construction began 1983
Commission date 1996
Operator(s) Eskom
Thermal power station
Primary fuel Coal
Secondary fuel Syngas
Power generation
Units operational 3 X 665 MW
3 X 716 MW
Nameplate capacity 4,110

Majuba Power Station between Volksrust and Amersfoort in Mpumalanga, South Africa, is a coal-fired power plant operated by Eskom. Majuba is Eskom's only power station that is not linked to a specific mine and it receives its coal from various sources.

History

Construction started in September 1983 and by April 1996 the first unit was connected to the grid. The last unit was commissioned in April 2001.

Power generation

Majuba has three 665 MW dry-cooled units and three 716 MW wet-cooled units with a total installed capacity of 4,110MW with a turbine Maximum Continuous Rating of 35.3% on the dry-cooled turbines and 37.7% on the wet-cooled units.[1]

Underground coal gasification

In addition to coal, the Majuba Power Station is fired by syngas produced by underground coal gasification at the nearby Majuba demonstration facility on the Majuba coalfield. The 3,000–5,000 cubic metres per hour (110,000–180,000 cu ft/h) pilot plant was commissioned in January 2007 and the first electricity was generated from the underground coal gasification gas on 31 May 2007. Produced syngas is transported from the facility to the power station by 7-kilometre (4.3 mi) pipeline with a diameter of 600 millimetres (24 in). There is a plan to build a 1,200 MW commercial generation facility.[2][3][4]

Silo Collapse

On 1 November 2014, the plant was running under normal load when a visible crack was reported on Silo 20 by a member of the operating staff at approximately 12:30. Personnel in the area were subsequently evacuated. At 13:20, the silo collapsed and the plant's output was immediately reduced from 3600MW to 1800MW. Shortly after the output was reduced further to 600MW.[5]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.

External links