Lua error in package.lua at line 80: module 'strict' not found. The Namie-Odaka Nuclear Power Plant (浪江・小高原子力発電所 Namie Odaka genshiryoku hatsudensho?) was a plan for a nuclear power plant in Minamisōma and Namie in the Fukushima Prefecture that had preparation for preliminary ground work done. It was a project of the Tōhoku Electric Power Company. The plans were canceled after urging from local lawmakers in the wake of the Fukushima-Daiichi meltdowns.[1]
Reactors on site
Unit 1
- Type: ABWR
- Start of construction: 2017[2]
- Begin of operation: 2021 (planned)
- Electric Output: 825 MW
- Fuel: UO2 fuel
References
- ↑ NucNet. Plans Cancelled For New Unit In Fukushima Prefecture. April 8, 2013.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.