Silver State South Solar Project
From Infogalactic: the planetary knowledge core
Silver State South Solar Project | |
---|---|
Location of Silver State South Solar Project in Nevada
|
|
Country | United States |
Location | Clark County |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Under construction |
Construction began | September 3, 2014 |
Owner(s) | First Solar |
Solar field | |
Type | Flat-panel PV |
Site area | 2,900 acres |
Power generation | |
Nameplate capacity | 250 MW |
The 250 MW Silver State South Solar Project is a photovoltaic power station which is being constructed by subcontractors for First Solar.[1] Construction is expected to be complete in early 2016.[1] The plant will be owned and operated by a subsidiary of NextEra Energy Resources, and power will be sold to Southern California Edison.[2]
The project occupies approximately 2,900 acres of public lands[3] and is located adjacent to Primm, Nevada, in the Jean Lake/Roach Lake Special Recreation Management Area (SRMA).[4]
Production
Year | November | December | Total |
---|---|---|---|
2015 | 342 | 8,211 | 8,595 |
Total | 8,595 |
See also
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
- ↑ 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.