1960s
- 1968
-
- The Transport Act 1968 sets out the terms under which passenger transport executives and passenger transport authorities are to be formed to co-ordinate and operate public transport in the United Kingdom's six largest conurbations outside London.[1]
- 1969
-
- SELNEC PTE (the South East Lancashire North East Cheshire Passenger Transport Executive) is established on 1 November 1969 with reference to the Transport Act 1968 to improve public transport in Manchester and its surrounding municipalities.[2]
1970s
- 1972
-
- The Picc-Vic tunnel receives planning approval from the Parliament of the United Kingdom.[3]
- The Local Government Act 1972 receives Royal Assent on 26 October 1972. The Act sets out provisions to reform local government in England by creating a system of two-tier metropolitan and non-metropolitan counties and districts across the country. Manchester and its surrounding municipalities are to be amalgamated as a metropolitan county.[4]
- 1973
-
- A government grant to fund the £86 million Picc-Vic tunnel is rejected amid a weak economic climate.[5]
- The United Kingdom local elections of 12 April 1973 creates the Greater Manchester County Council (GMCC) as a shadow authority.[6]
- 1974
-
- The Greater Manchester County Council publishes its structure plan in January 1974,[7] acknowledging its obligation to provide "an integrated and efficient system of public transport".[8]
- Greater Manchester is formally established as a metropolitan county of England on 1 April 1974; SELNEC PTE becomes the Greater Manchester Passenger Transport Executive (GMPTE), a functional body of the Greater Manchester County Council tasked with operating and improving public transport in the region.[2][9]
- Greater Manchester County Council submit a bid to the United Kingdom Government to acquire funding for the Picc-Vic tunnel.[10]
- 1977
1980s
- 1982
-
- GMPTE conclude that an overground metropolitan light rail system to replace or complement the region's under-used heavy railways is the most economical solution to improving Greater Manchester's public transport network.[8]
- 1983
-
- As part of its proposals for light rail, GMPTE suggest that the Oldham Loop Line be re-routed and extended with on-street tramways through Oldham and Rochdale town centres.[13]
- The Greater Manchester County Council purchases a disused section of the Cheshire Lines Committee railway between Chorlton-cum-Hardy and Didsbury for £1, hoping to stop development along the route and preserve it for use with a future light rail network.[14]
- 1984
-
- A Rail Study Group composed of officials from British Rail, Greater Manchester County Council and GMPTE, formally endorse a light rail system for Greater Manchester.[8]
- 1985
-
- The Local Government Act 1985 receives Royal Assent on 16 July 1985, stating that "the Greater London Council; and the metropolitan county councils" shall cease to exist.[citation needed]
- 1986
-
- The Greater Manchester County Council is abolished on 31 March 1986 under the Local Government Act 1985. GMPTE becomes a joint-board of the ten district councils of Greater Manchester.[2]
- GMPTE propose that Greater Manchester's light rail system include a line to Salford Quays to complement the regeneration of the Manchester Docks.[15][16]
- 1987
-
- A trial and public demonstration on 9 February 1987 uses Docklands Light Railway rolling stock on the freight-only Fallowfield Loop line adjacent to Debdale Park in Gorton.[17]
- 1988
-
- Plans to create a light rail line through Oldham and Rochdale town centres are laid before the Parliament of the United Kingdom.[13][18][19][20][21]
- The name Metrolink and a system-wide aquamarine, black and grey corporate branding and vehicle livery is revealed at a press launch in June 1988.[22]
- 1989
-
- On 27 September 1989, following a two-stage tender exercise, the Greater Manchester Passenger Transport Authority award a contract to the GMA Group (a consortium composed of AMEC, GM Buses, John Mowlem and Company, and a General Electric Company plc subsidiary)[23] who in turn form Greater Manchester Metro Limited to design, build, operate and maintain Phase 1 of Metrolink.[24]
- Michael Portillo aproves the Metrolink construction contract on behalf of the Department for Transport on 24 October 1989.[24]
1990s
- 1990
- 1991
-
- The Bury Line between Manchester and Bury is closed in stages between 13 July 1991 and 17 August 1991. Its 1200 V DC third rail electrified line is adapted for a 750 V DC overhead line operation.[25]
- 1992
-
- Metrolink begins its first passenger service on 6 April 1992 on a route between Victoria and Bury.[26][27]
- Metrolink services expand beyond Victoria to G-Mex tram stop on 27 April 1992.[27]
- Phase 1 on Metrolink's construction is completed with a service through to Altrincham joining the network on 15 June 1992.[27]
- Elizabeth II declares Metrolink open at a ceremony in Manchester on 17 July 1992, stating that Metrolink would "improve communication" between northern and southern Greater Manchester.[28][27][29]
- 1994
-
- A public consultation and public inquiry result in government endorsement of a Metrolink line to Salford Quays in 1994.[25][15][16]
- 1995
-
- In autumn 1995 a 4-mile (6.4 km) Metrolink line branching from Cornbrook tram stop to Eccles via Salford Quays is confirmed as Phase 2 of Metrolink.[25][15][16]
- 1997
-
- In April 1997 Altram, a consortium of the Serco Group plc, Gio. Ansaldo & C. and John Laing plc is appointed to construct the Eccles line; Serco takes on responsibility to operate and maintain the whole network under contract.[15][16][30]
- Serco Metrolink, a wholly owned subsidiary of Serco Limited, take over the operations and maintenance of Metrolink on 26 May 1997.[31]
- Construction of the Eccles Line officially begins on 17 July 1997.[15][16][30]
- 1999
-
- The Eccles Line is officially opened as far as Broadway tram stop on 6 December 1999 by the Prime Minister, Tony Blair, who praises Metrolink as "exactly the type of scheme needed to solve the transport problems of the metropolitan areas of the country".[32][33]
2000s
- 2000
-
- Services from Broadway to Eccles Interchange join the network on 21 July 2000, completing Phase 2.[25][15]
- 2001
-
- The Eccles Line is declared open by Anne, Princess Royal at a ceremony on 9 January 2001.[34]
- 2003
-
- In March 2003, Serco Investments buy out its partners; Altram (Manchester) Limited becomes a wholly owned subsidiary of Serco.[31]
- 2004
-
- A derailment occurs at Shudehill on 31 August 2004.[35]
- 2005
-
- A derailment occurs on London Road on 11 January 2005.[35]
- Work on Central Park tram stop and a flyover at Newton Heath over the heavy Caldervale Line commences in April 2005.[36]
- On 8 November 2005 a near miss occurs between two track workers and a tram; the tram ran over track maintenance equipment.[37]
- 2006
- 2007
-
- A derailment occurs on 17 January 2007 at Pomona station.[38]
- In July 2007 a 10-year contract to operate Metrolink was awarded to Stagecoach Metrolink, a subsidiary of the Stagecoach Group.[39][40]
- GMPTE and the Association of Greater Manchester Authorities (AGMA) submit a joint bid to the Transport Innovation Fund in July 2007, in order to procure a multi-million pound sum for public transport improvements linked to an anti-road traffic congestion strategy.[41][42]
- 2008
-
- A detrailment occurs on 29 June 2008 the junction of Princess St and Mosley St in central Manchester.[43][44]
- A referendum on the Greater Manchester Transport Innovation Fund is held in Greater Manchester on 19 December 2008,[45] in which 79% of voters reject plans for public transport improvements linked to a peak-time weekday-only Greater Manchester congestion charge.[46]
- 2009
-
- In May 2009, Greater Manchester Integrated Transport Authority (formerly GMPTA) and AGMA agree to create the Greater Manchester Transport Fund, £1.5billion raised from a combination of a levy on council tax in Greater Manchester, government grants, contributions from the Manchester Airports Group, Metrolink fares and third-party funding for "major transport schemes" in the region.[47][20]
- The Oldham Loop Line closes on 3 October 2009 for conversion from heavy rail to Metrolink.[48][49]
2010s
- 2010
-
- Phase 3b is approved with funding on a line-by-line basis between March and August 2010.[20][50]
- MediaCityUK tram stop station opens to passengers on 20 September 2010.[citation needed]
- 2011
-
- Construction work on Phase 3b begins in March 2011.[51]
- The Greater Manchester Combined Authority is established on 1 April 2011; GMPTE becomes Transport for Greater Manchester (TfGM) and receives additional powers over transport in Greater Manchester.[2][52]
- A pedestrian is struck by a Metrolink vehicle at Piccadilly Gardens on 5 June 2011. The pedestrian dies later in hospital.[53]
- Kingsway Business Park tram stop is authorised in July 2011; Drake Street tram stop is abandoned on technical and economic grounds.[54]
- RATP Group buy Stagecoach Metrolink Ltd from Stagecoach Group on 1 August 2011.[55]
- 2012
-
- On the Airport Line, a bridge over the M56 motorway, north of Hollyhedge Road in Wythenshawe, is installed on the night of 24–25 November 2012.[56]
- Services on the Oldham and Rochdale Line from Oldham Mumps to Shaw and Crompton tram stop commence on 16 December 2012.[57][58]
- A derailment occurs on 21 December 2012 at Market Street, Manchester.[59]
- 2013
-
- On 6 February 2013, a heavy goods vehicle collides with a tram in Weaste.[60]
- The Phase 3a element of the East Manchester Line opens to the general public on 11 February 2013, adding 8 new stops to the network at New Islington, Holt Town, Etihad Campus, Velopark, Clayton Hall, Edge Lane, Cemetery Road, Droylsden.[61]
- Driver training begins on the Oldham and Rochdale Line between Shaw and Crompton and Rochdale railway station on 11 February 2013.[62]
- Phase 3a is completed with the extension of services along the Oldham and Rochdale Line from Shaw and Crompton and Rochdale railway station on 28 February 2013. Metrolink becomes 43 miles (69 km) in system length.[63][64]
- Mosley Street tram stop closes on 17 May 2013 as part of a plan to remove a bottleneck in Manchester city centre.[65]
- The 2.7-mile (4.3 km) route of the South Manchester Line from St Werburgh's Road to East Didsbury tram stop opens on 23 May 2013 - three months ahead of schedule. It is the first section of Phase 3b line to open, and adds five new stops to the network.[14][66]
- On 8 July 2013, TfGM announces that overnight testing is to commence on the Phase 3b routes between Rochdale railway station and Rochdale Town Centre tram stop, and Droylsden and Ashton-under-Lyne tram stop.[67][68]
- On 31 July 2013, a man walks in front of a tram at Freehold tram stop, in Chadderton. Paramedics pronounce him dead at the scene.[69]
- On 1 August 2013, a car collides with a tram on Mosley Street in Manchester city centre.[70]
- On 3 August 2013, tram 3056, which was not in service, derails at the entrance to the Queen's Road depot.[71]
- The Institute of Economic Affairs publishes its appraisal of High Speed 2 on 19 August 2013, raising concerns that the high-speed railway will require indirect taxpayer funding by way of providing additional or enhanced infrastructure to integrate it with local transport systems. It cites Metrolink as an example of a system that would require modification to accommodate HS2 in Manchester.[72]
- Trams are tested on the Phase 3b route through Oldham town centre on 20 August 2013.[73]
- At the end of August 2013, a partnership consisting of Arup Group Limited, Bennetts Associates, High Speed Two Ltd and Manchester City Council publish draft proposals on the remodelling of Manchester Piccadilly station and its surrounds to accommodate and capitalise on High Speed 2. Included are two options on how Metrolink could be modified at Piccadilly as part of remodelling and enhancement work.[74][75][76]
- During the first week of September 2013, trams are tested on the Phase 3b route between Droylsden and Ashton-under-Lyne tram stop.[77]
- On 10 September 2013, a full Tameside Council meeting heard 9 October 2013 announced as the opening date for the Phase 3b route between Droylsden and Ashton-under-Lyne tram stop.[78][79]
- Construction work begins in mid-September 2013 to remodel the staff halt at Metrolink House in Cheetham Hill as Queens Road tram stop.[80]
- 2014
-
- 3 November 2014: Extension opened from St Werburgh's Road to Manchester Airport station.
See also
References
- ↑ Fawcett 2000, p. 19.
- ↑ 2.0 2.1 2.2 2.3 Hellewell & Reeve 2013, p. 5.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ HMSO. Local Government Act 1972. 1972 c.70
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Frangopulo 1977, p. 246.
- ↑ 8.0 8.1 8.2 Holt 1992, pp. 6–7.
- ↑ Frangopulo 1977, p. 187.
- ↑ 10.0 10.1 Holt 1992, p. 5.
- ↑ Donald, Cross & Bristow 1983, p. 45.
- ↑ Ogden & Senior 1992, p. 22.
- ↑ 13.0 13.1 Young 2008, p. 163.
- ↑ 14.0 14.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 15.0 15.1 15.2 15.3 15.4 15.5 15.6 GMPTE 2000.
- ↑ 16.0 16.1 16.2 16.3 16.4 16.5 GMPTE 2003, p. 10.
- ↑ Ogden & Senior 1992, p. 37.
- ↑ Holt 1992, pp. 92–93.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 20.0 20.1 20.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Holt 1992, pp. 26–27.
- ↑ Ogden & Senior 1992, p. 51.
- ↑ 24.0 24.1 24.2 Ogden & Senior 1992, p. 47.
- ↑ 25.0 25.1 25.2 25.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Ogden & Senior 1992, p. 82.
- ↑ 27.0 27.1 27.2 27.3 Holt 1992, p. 90.
- ↑ GMPTE 2003, p. 9.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 30.0 30.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 31.0 31.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ GMPTE 2003, p. 13.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 35.0 35.1 35.2 http://www.raib.gov.uk/cms_resources.cfm?file=/070416_R082007_Long_Millgate.pdf
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 37.0 37.1 http://www.transportforgreatermanchestercommittee.gov.uk/download/1539/item_08_metrolink_performance
- ↑ http://www.raib.gov.uk/cms_resources/080424_R092008_Pomona.pdf
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Young 2008, p. 160.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.raib.gov.uk/cms_resources.cfm?file=/090917_R252009_St_Peters_Square_v2.pdf
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ TfGM 2012, p. 14.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.raib.gov.uk/cms_resources.cfm?file=/120530_R082012_Piccadilly_Gardens.pdf
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://menmedia.co.uk/manchestereveningnews/news/s/1596758_delays-after-metrolink-tram-derails-in-piccadilly-gardens
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
Bibliography
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
- Lua error in package.lua at line 80: module 'strict' not found.
External links
Wikimedia Commons has media related to Lua error in package.lua at line 80: module 'strict' not found.. |
- www.lrta.org/manchester, a historical account of Metrolink from the Light Rail Transit Association
- www.metrolink.co.uk, the official Metrolink website
- www.metrolinkpromotions.co.uk, for official marketing, promotion and events
- www.tfgm.com, the official website of Transport for Greater Manchester