Lua error in package.lua at line 80: module 'strict' not found. The Wushaoling Tunnel (simplified Chinese: 乌鞘岭特长隧道; traditional Chinese: 烏鞘嶺特長隧道; pinyin: Wūshāolǐng Tècháng Suìdào) is a 21.05 km dual-bore railway tunnel in Gansu, north-west China. The east-bound bore opened on 30 March 2006. The west-bound bore is expected to open in October 2006.[1] It was briefly the longest railway tunnel in China[2] until the opening of the 27.84 km Taihang Tunnel in late 2007.

Location

Located on the Lanzhou-Wuwei section of the Lanzhou–Xinjiang Railway, the tunnel has reduced the distance between Dachaigou and Longgou by 30.4 km.[1] Key to the "Eurasian Land Bridge",[2] the tunnel is part of the 3,651 km section linking Lianyungang on the East China Sea coast with Ürümqi in Northwest China.[3]

Administratively, the tunnel is located within two county-level units of Wuwei Prefecture-level City. The eastern (actually, southeastern) portal is in Bairi Tibetan Autonomous County (a.k.a. Tianzhu Tibetan Autonomous County); the western (actually, northwestern) portal, in Gulang County.

Infrastructure

The tunnel consists of two bores with centres separated by 40 m. It is designed to allow speeds of 160 km/h.[1] The tunnel travels through complex geology, involving four regional fault zones and soft rock. The New Austrian Tunnelling method was adopted as the construction technique. An elliptical cross-section (horseshoe shape) was used for the majority of the tunnel, with a circular section used in the geologically challenging Fault Zone No. 7.[4] The right (east-bound) bore was constructed first, while the left tunnel was a parallel drift with smaller diameter to be enlarged later. The gradient is mainly 1.1%. The Wuwei portal has an altitude of 2447 m, and the Lanzhou portal 2663 m. The maximum depth of the tunnel is 1100 m.[5]

On 26 June 2003 Interfax reported that the total investment for the project was ¥ 7 billion ($845 million), that the project commenced construction in November 2002 and that it was scheduled to take six and a half years to complete. Also reported was that Chinese steel manufacturer Lingyuan Iron and Steel (Linggang) would provide 4,360 tons of steel products for the tunnel project.[6]

Coordinates

  • Lanzhou portal (east): Lua error in package.lua at line 80: module 'strict' not found., north of Dachaigou Town in Bairi Tibetan Autonomous County
  • Wuwei portal (west): Lua error in package.lua at line 80: module 'strict' not found., south of Heisongyi Town in Gulang County

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.