The line is Y-shaped, with the main line starting at Yanhua Station (燕化站) and the branch line starting at Zhoukoudianzhen Station (周口店镇站). The two merge at Raolefu Station (饶乐府站) before terminating at Yancun North Station (阎村北站), where the line connects to Fangshan Line.[1]
History
Construction of the Yanfang Line was scheduled to commence in September 2011 and be completed by 2013.[1] On October 17, 2011, the Ministry of Environmental Protection declined to approve plans for the line citing lack of approval for the project from the National Development and Reform Commission and uncertain environmental impact of the line on the South–North Water Transfer Project which has a channel and reservoir in Fangshan County.[2][3] As a result, the onset of construction has been delayed to at least the end of 2013.[3]
As of February 2016, construction on Yanfang Line has started, and the line is scheduled to open before December 31, 2017.[4]
Technology
This line will be the first in Beijing to be capable of unattended train operations, and the first in China to exclusively use subsystems developed by domestic manufacturers.[5]
References
- ↑ 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ (Chinese) 北京轨交燕房线工程因环评未过被叫停 2011-10-18
- ↑ 3.0 3.1 (Chinese) 北京地铁燕房线或今年底动工 2013-03-29
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.railjournal.com/index.php/asia/beijing-orders-first-driverless-metro-trains.html